Panasonic delivers efficient heating for converted water tower

Panasonic, heat pump, renewable energy, space heating

An abandoned water tower on the outskirts of Harrogate has been converted into a stunning family home, helped by a Panasonic air-source heat pumps to provide low-carbon heating and hot water. The 4-storey water tower was built in the 1940s and was in need of refurbishment, having lain derelict for several years.

Carol and Majod Nadrey from Bradford were keen to design their home exactly the way they wanted it. The task of designing and installing the heating and hot-water system was entrusted to renewable-heating firm Heacol of Cumbria.

The installation had more in common with a new-build project than a retrofit, so Heacol was able to design the whole system.

The system is based on two Panasonic Aquarea T-Cap heat pump. It works well with underfloor heating, which was chosen as the primary method of delivering heating to the building to increase the efficiency of the system.

The T-Cap includes weather-compensation controls as standard. Heacol also installed proportional thermostats so that when the outside temperature drops below 17°C, the system will run 24 h a day. This method of operation enable a much lower flow temperature to be used, maximising operational efficiency.

Heacol also installed a thermal store to heat domestic hot water directly as required rather than storing it, with its associated risks of legionella.

For more information on this story, click here: February 2016, 124
Related links:
Related articles:



modbs tv logo

Grenfell is the building industry's Piper Alpha says CIBSE

The recent passage of the Building Safety Act is a welcome recognition of the fact that making safe buildings is a highly skilled operation says the Chartered Institution of Building Services Engineers, endorsing the need for more effective regulation and a profound change in culture.

Underlying project-starts uptick indicates gradual recovery, Glenigan data suggests

  • 13% rise in detailed planning approvals against the preceding three months
  • 18% decline in main contract awards against the previous year
  • 9% increase in underlying starts during the three months to May

Glenigan has released the June 2022 edition of its Construction Review.