Wieland structured cabling brings new life to listed building

Wieland Electric, structured cabling

Wieland Electric’s Metalynx2 structured wiring system was the preferred choice for lighting and power cables throughout the refurbished Quadrant 2 building in Air Street near Piccadilly Circus in London. Operated by The Crown Estates, this Grade II-listed building has been totally redeveloped behind its existing facade to provide new Grade A office space.

All electrical work was carried out by Imtech, which specified Metalynx2 as it provides quick and fail-safe installation using a unique coding system for power distribution.

Labour savings of 70% are achieved compared with traditional methods, and there is no waste on site.

Wieland worked closely with Imtech to offer working drawings, project management and on-site support as and when required.

For more information on this story, click here: April 2016 131
Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.