Back to school for Wieland Electric

Wieland Electric, structured wiring, structured cabling

Wieland Electric’s Metalynx2 structured wiring system has been installed for the distribution of all power and lighting throughout the refurbished Halley House Primary School in east London. The school is in the former building of the Metropole College, which was purchased by the Education Funding Agency (EFA) to ensure the provision of more primary schools in the E8 area in the future.

The system was specified by electrical contractor Etech Southern, which designed an installed the complete electrical infrastructure in accordance with the EFA output specification. The lighting system was stripped out and replaced with a DALI lighting control system to comply with Part L.

The renovation was split into two phases, The Metalynx2 system enabled Etech Southern to maximise productivity on site as the product is pre-wired and pre-tested at Wieland’s factory and simply plugged together on site.

Compared to traditional installation methods, connection time on site can be reduced by 70%.

For more information on this story, click here: October 2016, 128
Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.