Back to school for Wieland Electric

Wieland Electric, structured wiring, structured cabling

Wieland Electric’s Metalynx2 structured wiring system has been installed for the distribution of all power and lighting throughout the refurbished Halley House Primary School in east London. The school is in the former building of the Metropole College, which was purchased by the Education Funding Agency (EFA) to ensure the provision of more primary schools in the E8 area in the future.

The system was specified by electrical contractor Etech Southern, which designed an installed the complete electrical infrastructure in accordance with the EFA output specification. The lighting system was stripped out and replaced with a DALI lighting control system to comply with Part L.

The renovation was split into two phases, The Metalynx2 system enabled Etech Southern to maximise productivity on site as the product is pre-wired and pre-tested at Wieland’s factory and simply plugged together on site.

Compared to traditional installation methods, connection time on site can be reduced by 70%.

For more information on this story, click here: October 2016, 128
Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.