Adcock completes major R22 replacement project

Adcock, R22, contractor, air conditioning

Adcock Refrigeration & Air Conditioning has completed a major R22 replacement project for Fujitsu Services in Birmingham. The project, on behalf of E2, a leading provider of bespoke energy management, involved replacing all the air-conditioning and air-handling units in the entire 13 500 m2 building and was spread over eight months while the building was fully occupied.

There were six phases, which required individual working areas of the building to be relocated temporarily during the fit-out. Work included decommissioning the existing server room.

In total, 11 Fujitsu VR-II heat-recovery systems were installed, along with 27 condensing units, 120 ducted fan coils and two split systems. The system are fully managed by a BACnet gateway and touch-panel system control.

The server-room systems were replaced with a heat-recovery close-control system comprising three DencoHappel modular heat-recovery units.

Fujitsu Services has subsequently awarded Adcock the contract to service and maintain the new systems.

Related links:
Related articles:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.