A flexible friend for hot yoga

Humidity Solutions, space heating, humidification

Humidity Solutions has supplied a Vesuvius heating and humidification tower to the new Yoga Shed in Hitchin. It delivers 18 kW of heating and 10 kg/h of humidification to produce a stable 40°C and 50% RH. It also introduces and filters fresh air, using heat recover to minimise energy consumption.

This is the 20th hot yoga to install a Vesuvius unit. They have also been installed in pharmaceutical laboratories and biscuit production, as well as a gym for F1 racing drivers to simulate driving in extreme conditions.

These units provide exceptional control of temperature and humidity, which can be adjusted via a remote controller.

For more information on this story, click here: June 2017, 130
Related links:
Related articles:



modbs tv logo

Grenfell is the building industry's Piper Alpha says CIBSE

The recent passage of the Building Safety Act is a welcome recognition of the fact that making safe buildings is a highly skilled operation says the Chartered Institution of Building Services Engineers, endorsing the need for more effective regulation and a profound change in culture.

Underlying project-starts uptick indicates gradual recovery, Glenigan data suggests

  • 13% rise in detailed planning approvals against the preceding three months
  • 18% decline in main contract awards against the previous year
  • 9% increase in underlying starts during the three months to May

Glenigan has released the June 2022 edition of its Construction Review.