Elco develops CHP CPD

Elco, space heating, CHP, CPD

To help building-services engineers maximise the benefits of CHP when incorporated into a commercial heating systems, Elco Heating Solutions has developed a CIBSE-approved CPD module. It considers all major aspects of commercial CHP installations, including how to size a CHP unit and the different design approaches for optimum running times and efficiencies. This CPD is delivered alongside a worked example in a hotel application.

Also included in the CPD are the fundamentals of a thermally led CHP installation, including correctly sizing a buffer vessel/thermal store, followed by details on combining CHP with gas-fired condensing boilers.

Finally, the module covers the extensive benefits of using CHP in commercial installations, as well as the considerations for achieving ‘good quality’ CHP status.

Ian Bradley, managing director for Elco Heating Solutions, says, ‘We believe there are still some fundamental variances in system design approaches. So, following extensive research of CHP theory, combined with test data from on-site installations, we have developed this CPD to identify the vital aspects of system design.

Related links:
Related articles:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).