Crane’s Dominator role in London projects

Arsenal
Among London projects using Crane Z3000 Dominator compact flow-management systems to control hydronic systems is the new stadium of Arsenal Football Club. Heating and air conditioning in the office building and the players’ changing rooms will be controlled by fan-coil units fitted with these valve. Crane is also supplying all control valves for the various plant rooms around the new Emirates Stadium. Down in central London, Crane has supplied 1400 Dominator systems to control heating and cold-water systems throughout the 12-storey, 28 000 m2 Palestra development on Blackfriars Bridge Road. These valves were connected to the fan-coil units by Bedford Fabrications as part of the off-site prefabrication programme. Crane has also supplied all the valves for the plant rooms in the Palestra project. They include a full range of commissioning valves, check valves and strainers — supplied to the fabricators constructing the plant rooms off site.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.