Crane’s Dominator role in London projects

Arsenal
Among London projects using Crane Z3000 Dominator compact flow-management systems to control hydronic systems is the new stadium of Arsenal Football Club. Heating and air conditioning in the office building and the players’ changing rooms will be controlled by fan-coil units fitted with these valve. Crane is also supplying all control valves for the various plant rooms around the new Emirates Stadium. Down in central London, Crane has supplied 1400 Dominator systems to control heating and cold-water systems throughout the 12-storey, 28 000 m2 Palestra development on Blackfriars Bridge Road. These valves were connected to the fan-coil units by Bedford Fabrications as part of the off-site prefabrication programme. Crane has also supplied all the valves for the plant rooms in the Palestra project. They include a full range of commissioning valves, check valves and strainers — supplied to the fabricators constructing the plant rooms off site.
Related links:



modbs tv logo

Smart Buildings Show announces full conference programme for 2021

Smart Buildings Show, the UK’s leading, dedicated smart buildings event, has unveiled its 2021 conference programme. The event, supported by headline sponsor Bluetooth, will take place at ExCeL London on 6-7 October 2021, featuring industry-leading speaker sessions from some of the sector’s most renowned brands, including Bluetooth, Johnson Controls, Microsoft, Schneider Electric,  Siemens Smart Infrastructure and Vodafone.

Actuate UK issues climate warning to world leaders ahead of COP26 and urges action “before it is too late”

With six weeks to go until COP26, engineering alliance Actuate UK has issued a stark message to world leaders gathering in Glasgow, urging them to tackle the climate crisis now “before it is too late”.

Calendar