VES helps provide a stable environment

VES
As part of the refurbishment of Hyde Park Barracks in London, the stables, nearly 300 of them, are ventilated by 13 air-handling units from the Max range of VES Andover. Each unit provides around 6.5 m3/s of tempered air. Some units incorporate heat recovery. The order was worth over £85 000 and placed by ECG Group in Berkamsted. The barracks were built in the early 1970s and are home to the Life Guards and the Blues & Royals regiments.
Related links:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.