Ensuring healthy boiler performance

Priva
Priva controls have been installed to achieve efficient operation of the refurbished boiler house in this day hospital.
As part of the refurbishment of the boiler house at Petherton Road Day Hospital in Bristol, Priva control systems have been installed. They were specified by Priva partner Alpha Control Systems, which created an optimum-start program comprising boiler sequencing on return temperature to ensure equal operating times and a compensated heating zone via a 3-port valve. anders.noren@privaweb.co.uk
Related articles:



modbs tv logo

Heat pump market represents a colossal opportunity, says BESA

BESA’s head of technical Graeme Fox said the heat pump market represented “an absolutely colossal opportunity” for suitably qualified engineers but warned that the industry would have “to rapidly scale up capacity and needed considerable investment in additional skills to deliver all these hugely ambitious targets”.

Mitsubishi Electric launches modular R32 e-series chiller

Mitsubishi Electric has launched an R32 version of its popular e-series chillers, available in 150kW and 180kW units. 

Calendar