Tetris chillers on 2-week delivery from Walter Meier

Walter Meier (Climate UK) can now deliver Blue Box Tetris modular chillers within two working weeks of order, providing a rapid response for fast-track projects and emergency chiller-replacement projects. Multiple scroll compressors and R410A contribute to the energy efficiency of these compact units, which have a small footprint and low noise levels. There are versions of Tetris chillers with 26 sizes offering cooling capacities from 110 to 930 kW. Options include heat pump, integrated hydraulic module, total or partial heat recovery and free cooling. Further energy efficiencies are achieved with options such as electronic expansion valves and EC (electronically commutated) axial fans, providing up to 15% energy savings per fan, as well as less noise and finer control of air flow.
For more information on this story, click here: Sept, 08 178
Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.