Rehau pipework offers ‘peak’ performance

Rehau pipework
Rehau has delivered over 10 000 m of its Rauthermex pre-insulated polymer pipework since it installed an unwinding machine at its UK plant in Blaenau, North Wales — enough to stretch to the top of the nearby Mount Snowdon. This pipework system for district heating comprises a carrier pipe in PE-Xa polymer, insulted with closed-cell polyurethane foam. It is being widely specified for use in district-heating schemes with condensing boilers or geothermal heat sources, where its longitudinal stability and high hydraulic performance give it a critical competitive advantage. The Blaenau factory has cut lead times in the UK compared with waiting for supplying from Germany.
For more information on this story, click here: Dec 08, 61
Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.