Rehau pipework offers ‘peak’ performance

Rehau pipework
Rehau has delivered over 10 000 m of its Rauthermex pre-insulated polymer pipework since it installed an unwinding machine at its UK plant in Blaenau, North Wales — enough to stretch to the top of the nearby Mount Snowdon. This pipework system for district heating comprises a carrier pipe in PE-Xa polymer, insulted with closed-cell polyurethane foam. It is being widely specified for use in district-heating schemes with condensing boilers or geothermal heat sources, where its longitudinal stability and high hydraulic performance give it a critical competitive advantage. The Blaenau factory has cut lead times in the UK compared with waiting for supplying from Germany.
For more information on this story, click here: Dec 08, 61
Related links:
Related articles:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.