Rehau pipework offers ‘peak’ performance

Rehau pipework
Rehau has delivered over 10 000 m of its Rauthermex pre-insulated polymer pipework since it installed an unwinding machine at its UK plant in Blaenau, North Wales — enough to stretch to the top of the nearby Mount Snowdon. This pipework system for district heating comprises a carrier pipe in PE-Xa polymer, insulted with closed-cell polyurethane foam. It is being widely specified for use in district-heating schemes with condensing boilers or geothermal heat sources, where its longitudinal stability and high hydraulic performance give it a critical competitive advantage. The Blaenau factory has cut lead times in the UK compared with waiting for supplying from Germany.
For more information on this story, click here: Dec 08, 61
Related links:
Related articles:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.