Rehau pipework offers ‘peak’ performance

Rehau pipework
Rehau has delivered over 10 000 m of its Rauthermex pre-insulated polymer pipework since it installed an unwinding machine at its UK plant in Blaenau, North Wales — enough to stretch to the top of the nearby Mount Snowdon. This pipework system for district heating comprises a carrier pipe in PE-Xa polymer, insulted with closed-cell polyurethane foam. It is being widely specified for use in district-heating schemes with condensing boilers or geothermal heat sources, where its longitudinal stability and high hydraulic performance give it a critical competitive advantage. The Blaenau factory has cut lead times in the UK compared with waiting for supplying from Germany.
For more information on this story, click here: Dec 08, 61
Related links:
Related articles:



modbs tv logo

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.

Six in 10 UK businesses look to adapt operations in response to extreme heat

According to the Q2 Barclays Business Prosperity Index, six in 10 businesses surveyed (60%) have either increased investment to adapt to extreme heat (37%) or are considering doing so (23%).