RIBA approves new CPD from Big Foot systems

Big Foot, CPD

The new CPD reflects the growing use of roof space for siting heavy plant on flat roofs, and highlights the importance of using support systems that minimise risks of leaks and cold bridging. The presentation also demonstrates the advantages of off-site fabrication to reduce installation time.

The new Big Foot CPD includes a look at the effects of damage to a flat-roof membrane, including leaks and cold bridging. It also shows examples of poorly supported equipment and the problems that they cause.

Big Foot only needs the weights and dimensions of roof plant to provide a high-quality support.

For more information on this story, click here: June 10, 210
Related links:
Related articles:



modbs tv logo

Nuaire celebrates long service and a people-first culture built over decades

Nuaire has celebrated the exceptional loyalty and dedication of its employees at a long service awards event – a powerful reflection of a workplace culture that has been built and sustained over generations.

New advanced training facility opens to upskill HVAC industry

A new education facility has opened its doors and is set to advance skills and knowledge across the UK’s HVAC industry.