Lochinvar checks in at Travelodge

Budget hotel chain Travelodge has chosen Lochinvar equipment to supply domestic hot water for its new Clacton-on-Sea Central Travelodge. Close to Clacton pier, this hotel has 57 rooms.

Two TurboCharger gas-fired condensing water heaters with integral storage have been installed. These units have low storage but fast hot-water recovery. Condensing technology maximises operating efficiency and reduces carbon emissions compared with other hot-water generators.

The TurboCharger floor-standing range comprises six models with outputs from 690 to 2160 l/h, based on a temperature rise of 44 K, and with storage capacities of 230 or 380 l.

For more information on this story, click here: June 10, 127
Related links:
Related articles:



modbs tv logo

New Sustainability Director for Wates Group

Wates Group, a family-owned development, building and property maintenance company, has appointed Cressida Curtis as its new Group Sustainability Director.

Domus Ventilation appoints new contractor sales managers

Ventilation systems manufacturer Domus Ventilation has announced the arrival of three new Contractor Sales Managers.