Distribution boards can have integral energy meters installed

Wylex, submetering, sub-metering, distribution board

In response to the requirement in Part L2 of the Building Regulations to meter energy usage in non-domestic buildings, Wylex has launched a range of modified distribution boards rated at 125 A. The NHTN range can be fitted with a multi-function digital kWh meter within the enclosure.

To complement this range, a meter pack is available to enable a contractor to easily install an incoming standard check meter or MID-certified meter (for monitoring the resale of electricity). The pack includes everything needed to fit and connect the internal meter into the new board — including a DIN rail mounting plate, multi-function kWh meter, three current transformers and three protection fuses. There is also a complete numbered wiring loom and connections.

For more information on this story, click here:  May 2011, 160
Related links:
Related articles:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.