MHS wall-hung boilers have double-helix heat exchanger

MHS Boilers, Thision

MHS Boilers has launched a range of gas-fired wall-hung condensing boilers with outputs from 45 to 145 kW. Thision L boilers have a double-helix stainless-steel heat exchanger and a turndown ratio of 6:1. Up to eight boilers can be installed in a purpose-built cascade rig to deliver an output of up to 1140 kW. Built-in controls can manage two heating zones and a DHW cylinder; it can be adapted to provide cascade management.

Weather compensation is built into the boiler. Additional control modules enable up to 30 mixed-flow heating circuits to be controlled.

The cascade rig is supplied with moulded EPC insulation to reduce heat loss and keep down the plantroom temperature.

These boilers come with a 2-year parts and labour warranty and free service for the first year.

For more information on this story, click here:  June 2011, 179
Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.