Voltage optimiser cuts electricity bills by 17.3%

An immediate 17.3% reduction in electricity consumption has been achieved following the installation of a voltage optimiser at Peasley Cross Hospital in St Helens. Before the installation of the equipment from Streamline Power, the average voltage on site was 246.3 V, peaking at 252.8 V —close to the legal maximum of 253 V. The voltage optimiser has reduced the voltage to 223 V, balanced the incoming phases and controlled the incoming voltage to within 0.5% of target.

The project will pay for itself in 32 months and deliver an internal rate of return of 39%.

Installation took two working days, and the electricity supply was switched over during a period of low demand in the working day.

For more information on this story, click here: December 2011, 81
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.