Nine times faster installation for panelboards

Eaton Electric, panelboards, panel boards

Eaton Electric has created a video showing how its new Memshield 3 MCCB panelboards are up to nine times faster to install, thanks to their easy-to-fit plug-and-play metering facilities. It can be viewed on Eaton’s YouTube channel (URL below).

Instead of having to make up to 42 individual connections to wire an energy meter, a task that typically takes around 90 minutes and is error prone because of the large number of connections, the new panelboard requires only a few simple plug-in connections, so a meter can be easily wired in less than 10 minutes.

These panelboards can be supplied in versions to accommodate incoming devices rated at up to 800 A and outgoing devices from 16 to 400 A. They are available with six and 12 outgoing ways in all ratings, with selected ratings also available in 18-way versions. At the low-current end of the range, 250 A incomer boards are also offered in 4- and 8-way versions.

Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.