BRE installs phase-change ceiling tiles

Armstrong, phase change, thermal mass, air conditioning
Armstrong CoolZone ceiling tiles help stabilise the environment in the main seminar area of the visitors’ centre of the BRE innovation park in Scotland.

Ceiling tiles from Armstrong Ceilings incorporating phase-change material have been installed in the BRE’s latest innovation park in Scotland. The Coolzone system is in the main seminar area of the Ravenscraig Regeneration project and will help provide a stable and comfortable environment. Some 40 m2 of ceiling tiles have been installed.

The CoolZone system incorporates BASF’s Micronal phase-change material into Armstrong’s plain metal ceiling tiles. Micronal, in the form of microscopic polymer capsules containing a wax storage medium, is embedded in gypsum and then encased in the metal tile.

In tests, CoolZone tiles delayed the onset of air conditioning in an average office by 4 to 5 h. This delay can reduce HVAC energy costs by about 40% and reduce peaks in demand for air conditioning — as well as improving thermal comfort.

Designed to achieve a BREEAM ‘Outstanding’ rating, this cost-effective super-insulated building also features zoned lighting and heating systems, an air-source heat pump, solar water heating, solarPV and an extensive BMS to monitor and manage the building’s performance.

For more information on this story, click here: Nov 2012, 134
Related links:
Related articles:



modbs tv logo

WIN a Bang & Olufsen speaker system – in the MBS subscriber prize draw 2024

Subscribe, or renew your free subscription, to MBS between 1st June and September 30 2024 and you could win a great prize.

Going Underground

ABM has announced a significant contract win with Transport for London (TfL) to provide mechanical and electrical (M&E) services across the London Underground network.