Safe access to rooftop plant

Big Foot Systems, roof top plant access

Big Foot Systems offers a comprehensive range of Safe Access products for equipment installed on flat roofs. It complements the company’s portfolio of free-standing system to support plant and installed services on flat roofs.

Standard equipment for assembling on site includes walkways, platforms and step-over solutions. The company can also supply systems tailed to meet individual design parameters.

Systems can be made from and/or galvanised metalwork.

Step overs are available with two, three and four steps and a 1 m landing section. The four legs have 305 mm feet and anti-vibration mats for stability.

Walkways have a gritted top on the grating to provide a non-slip surface in any weather. They are supported on rubber blocks.

For more information on this story, click here: May 2013, 185
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.