Safe access to rooftop plant

Big Foot Systems, roof top plant access

Big Foot Systems offers a comprehensive range of Safe Access products for equipment installed on flat roofs. It complements the company’s portfolio of free-standing system to support plant and installed services on flat roofs.

Standard equipment for assembling on site includes walkways, platforms and step-over solutions. The company can also supply systems tailed to meet individual design parameters.

Systems can be made from and/or galvanised metalwork.

Step overs are available with two, three and four steps and a 1 m landing section. The four legs have 305 mm feet and anti-vibration mats for stability.

Walkways have a gritted top on the grating to provide a non-slip surface in any weather. They are supported on rubber blocks.

For more information on this story, click here: May 2013, 185
Related links:
Related articles:



modbs tv logo

Smart and sustainable

Schneider Electric has announced its smart energy management solutions feature in the London headquarters of design, engineering and consulting group Sidara.

Fields of green

Lochinvar has provided a complete heating and hot water system powered by four air source heat pumps for a new luxury 72-bedroom care home set in rolling Yorkshire countryside.