Hotel goes green in the Forest of Dean

Hamworthy, space heating, biomass boiler, maintenance, refurbishment
From gas to biomass at a Gloucestershire hotel and country club using a Hamworthy Herz biomass boiler.

Renewable energy from a biomass boiler is part of the installation that replaces a 30-year-old cast-iron gas-fired boiler at the Bells Hotel & Country Club in the Forest of Dean, Gloucestershire. Working with Hewer FM and Hamworthy, hotel manager Curt Green assessed the cost of biomass compared with a traditional gas boiler, taking into account the relevant Government incentives. He comments, ‘When we compared the proposals for both systems, it was a no brainer. The payback period is relatively short when claiming the Renewable Heat Incentive, so it made good commercial sense.’

Heating and hot water is now provided by a Hamworthy Herz Pelletstare 45 kW biomass boiler and a 1000 l buffer/accumulator vessel. An intermediate hopper automatically feeds pellets to the boiler as required. The store can hold up to 200 kg, and a local supplier delivers fuel as and when needed.

Rob Lane, contracts manager with Hewer FM, managed the design and installation. He says, ‘This was our first biomass boiler installation, and we were really pleased at how smoothly the project went. We have worked with Hamworthy for many years, and they supported us well on this installation. We are now increasingly seeing more projects that are considering biomass boilers to help reduce heating costs and lower carbon emissions.’

The RHI claim for a recent quarter was for over 42 MWh, for which the hotel hopes to receive £3500.

For more information on this story, click here: July 2013, 91
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.