Cambridge cascade

Cambridge cascade

Two Tyneham 290HT 27kW air source heat pumps from Hamworthy Heating have been installed
in cascade for underfloor heating in a new extension at a primary school in Cambridge.

To accurately meet the heating requirements of the new school extension and ensure an even distribution of heat, the new system from Hamworthy Heating includes two 290HT 27kW Tyneham heat pumps with natural refrigerant, configured in a hydraulic cascade set up. The heat pumps are connected to a 500L buffer cylinder, which also features an electrical heating element, controlled by a BMS.

This cascade arrangement allows for
the heat capacity to be equally distributed according to the specific heating demands of the new school building. Rather than rely on a larger single heat pump that could run inefficiently at partial load, the new cascade set up enables the units, which have inverter controlled compressors, to adjust their capacities as needed which will enable the school to achieve a more accurate match to its actual heating demand and optimise performance.

Additionally, as the new system can adjust to keep the heat pumps operating at their most efficient state, cycling of heat pumps and unnecessary energy consumption is avoided.

Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.