Mikrofill helps seafront hotel give warm welcome

maintenance, refurbishment, Mikrofill, boiler, space heating, hot water, DHW

Effective heating and hot-water services have been restored at the St George’s Hotel on the sea front of Llandudno following the installation of Mikrofill wall-mounted condensing boilers and its hot-water loading systems. The new equipment replaces dated horizontal calorifiers and inefficient cast-iron boilers — all of which had long been in need of replacing.

The hotel turned to Ener-G, a specialist in the energy-efficiency market, which worked with installer Heater Services of Rochdale to resolve the problem.

The new equipment comprised four Ethos 130 kW condensing boilers in free-standing frames and three Rapide Extreme 500 l hot-water loading systems. Each unit can deliver 2570 l/h of hot water while maximising the efficiency of the Ethos boilers. Temporary boiler plant enabled the hotel to stay open while the work was carried out.

For more information on this story, click here: March 2014, 105
Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.