Wieland structured cabling brings new life to listed building

Wieland Electric, structured cabling

Wieland Electric’s Metalynx2 structured wiring system was the preferred choice for lighting and power cables throughout the refurbished Quadrant 2 building in Air Street near Piccadilly Circus in London. Operated by The Crown Estates, this Grade II-listed building has been totally redeveloped behind its existing facade to provide new Grade A office space.

All electrical work was carried out by Imtech, which specified Metalynx2 as it provides quick and fail-safe installation using a unique coding system for power distribution.

Labour savings of 70% are achieved compared with traditional methods, and there is no waste on site.

Wieland worked closely with Imtech to offer working drawings, project management and on-site support as and when required.

For more information on this story, click here: April 2016 131
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.