Wieland structured cabling brings new life to listed building

Wieland Electric, structured cabling

Wieland Electric’s Metalynx2 structured wiring system was the preferred choice for lighting and power cables throughout the refurbished Quadrant 2 building in Air Street near Piccadilly Circus in London. Operated by The Crown Estates, this Grade II-listed building has been totally redeveloped behind its existing facade to provide new Grade A office space.

All electrical work was carried out by Imtech, which specified Metalynx2 as it provides quick and fail-safe installation using a unique coding system for power distribution.

Labour savings of 70% are achieved compared with traditional methods, and there is no waste on site.

Wieland worked closely with Imtech to offer working drawings, project management and on-site support as and when required.

For more information on this story, click here: April 2016 131
Related links:
Related articles:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.