Schneider delivers control for university regeneration project

Schneider Electric, electrical services, building management system, StruxureWare

As part of the regeneration of Swansea University’s 65 acre Bay Campus, EFT Consult worked with Schneider Electric on a complete building-management system, StruXureWare, wiring accessories, industrial cable containment, LV distribution, rising busbar and metering. Schneider Electric’s involvement so far is over £1 million, and the overall regeneration project has been valued at £450 million.

The solutions devised by EFT and Schneider Electric have been deployed in 14 buildings.

The Bay Campus is on an old BP Transit site and is home to the College of Engineering and School Management students. It will be home to almost 5000 students and 1000 staff.

For more information on this story, click here: October 2016, 122
Related links:
Related articles:



modbs tv logo

Government’s heat pumps plan “doomed to failure”

The Government’s plan to increase heat pump installations is “doomed to failure” without a substantial increase in training for installers, according to consumer advice specialists at The Heating Hub 

Extension welcomed, but a long-term policy is still needed

The Government’s 10-point plan for a Green Industrial Revolution, is a positive step in the right direction 

Calendar