Mikrofill replaces boilers in CHP plant at Bedford Hospital

Mikrofill, boiler, space heating, maintenance, refurbishment

The replacement of existing CHP plant at Bedford Hospital includes boilers supplied by Mikrofill. The three Ethos boilers each have an output of 130 kW and will primarily serve the hospital’s HWS demand. They are configured to provide heat into the main system when hot-water requirements are at a minimum.

These boilers have stainless-steel heat exchanges and operate in cascade so that the total output of 390 kW can be modulated down 13 kW for precise load matching.

The scheme is fully sequenced to ensure that the LTHW boilers serve heating in preference to the existing steam-to-LTHW heat exchanges. This takes load off the central plant and improves overall system efficiency.

For more information on this story, click here: March 2017, 83
Related links:
Related articles:



modbs tv logo

Improved dry pocket for SpiroTrap and SpiroCombi

Spirotech has improved the dry pocket of the magnetic dirt separator in its steel SpiroTrap and SpiroCombi units, making them even easier to maintain.

FREE Heat Pump Training from BESA

The Building Engineering Services Association (BESA) is launching the industry’s only online training course for heat pump installation to help fill a skills gap highlighted by the government’s flagship Green Homes Grant voucher scheme.

Calendar