Viega Prevista meets the latest Water Regulation guidance

Viega Prevista

Viega Prevista WC suites now comply with the Regulation 4 of the Water Supply (Water Fittings) Regulations of 1999 and have achieved certifications with WRAS and KIWA (KUKreg4).

To address industry concerns about potential backflow from WC cisterns into the mains supply, WRAS and KIWA have updated their acceptance criteria for approval of WC suites. Evidence suggests that in some cases existing backflow protections could be compromised and are allowing ‘blue water’ stored in WC cisterns to enter into the mains supply via the filling valve. The revised requirements are that a Type AG filling valve be installed inside the cistern to allow for a physical “air gap” between the lowest point of the water outlet and the critical water level.

Related links:
Related articles:



modbs tv logo

Manufacturer helps equip skills centre

Ideal Heating has helped to equip a new £500,000 green energy centre in Merseyside which is seeking to attract fresh talent into the heating industry.

Acoustic solutions suite with easy access to services at University of Birmingham

A suite of ceiling and wall acoustic solutions have been specified for The University of Birmingham’s new landmark Molecular Sciences building, which will provide a hub for research and academic work.