Viega Prevista meets the latest Water Regulation guidance

Viega Prevista

Viega Prevista WC suites now comply with the Regulation 4 of the Water Supply (Water Fittings) Regulations of 1999 and have achieved certifications with WRAS and KIWA (KUKreg4).

To address industry concerns about potential backflow from WC cisterns into the mains supply, WRAS and KIWA have updated their acceptance criteria for approval of WC suites. Evidence suggests that in some cases existing backflow protections could be compromised and are allowing ‘blue water’ stored in WC cisterns to enter into the mains supply via the filling valve. The revised requirements are that a Type AG filling valve be installed inside the cistern to allow for a physical “air gap” between the lowest point of the water outlet and the critical water level.

Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.