Viega Prevista meets the latest Water Regulation guidance

Viega Prevista

Viega Prevista WC suites now comply with the Regulation 4 of the Water Supply (Water Fittings) Regulations of 1999 and have achieved certifications with WRAS and KIWA (KUKreg4).

To address industry concerns about potential backflow from WC cisterns into the mains supply, WRAS and KIWA have updated their acceptance criteria for approval of WC suites. Evidence suggests that in some cases existing backflow protections could be compromised and are allowing ‘blue water’ stored in WC cisterns to enter into the mains supply via the filling valve. The revised requirements are that a Type AG filling valve be installed inside the cistern to allow for a physical “air gap” between the lowest point of the water outlet and the critical water level.

Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.