Kooltherm pipe insulation on target at Wembley Park

Kooltherm at Wembley

The 633 apartments at Madison, Quintain’s 85-acre Wembley Park development, are all connected to a district heating network with secondary pipework insulated using Kingspan Kooltherm pipe insulation.

Kooltherm Pipe Insulation was installed on secondary LTHW pipework across the development. With a thermal conductivity as low as 0.025 W/mK, it offers one of the thinnest and most thermally-efficient solutions for insulating pipework. Specifiers and contractors are able to limit heat losses when insulating secondary pipework to the minimum insulation thicknesses in table 8 of Objective 3.9 of CIBSE CP1 Heat Networks Code of Practice or to easily meet the new enhanced targets within BS 5422:2023.

Related links:
Related articles:



modbs tv logo

Register NOW for Smart Buildings Show 2024

Now is the time to register for Smart Buildings Show 2024 which has announced an impressive conference programme featuring industry leading speakers who will tackle all of today’s big issues head on.

Inside number nine

Click Scolmore was the preferred supplier of electrical accessories for a prestigious single-phase build to rent development in London.