Comfort at the Palais

Comfort at the Palais

Distech Controls has installed of its Eclypse building management system (BMS) at the Grand Palais, Paris, providing a comprehensive solution that addresses heating and cooling production as well as occupant comfort.

An emblematic monument in the heart of Paris, the Grand Palais was built for the 1900 Universal Exhibition and has been a cultural centre ever since. The Grand Palais underwent its first major restoration since 1900 to host the fencing and taekwondo sporting events in its mythical Nave for the Paris 2024 Olympic and Paralympic Games. As part of the renovation, a number of Distech Controls solutions have been installed to deploy a BMS and improve the monument’s environmental performance.

The Eclypse solution from Distech Controls provides air treatment for the Grand Palais, in the Nave and adjoining galleries. The ECY-S1000 connected modular controllers are linked directly to a weather station, enabling a night-time free cooling system to be activated when conditions are right.

As soon as the air outside is colder than inside,
the Nave’s glazed windows open to let in outside air, ensuring natural cooling and air renewal, which in turn leads to significant energy savings.

Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.