Cistermiser welcomes DEFRA’s water saving targets

DEFRA Logo

Cistermiser has welcomed the ambitious water saving targets for commercial buildings recently set by DEFRA. These include a national goal to reduce water leakage by 37% by 2038 and 50% by 2050, along with specific targets for commercial buildings to achieve a 9% reduction in leakage by 2038 and 15% by 2050.

Water scarcity and efficiency have become critical challenges for the UK, and DEFRA’s targets underscore the urgent need for action. A leaking toilet, for example, can waste between 200 and 400 litres of water per day, often unnoticed, while a dripping tap can waste around 5,500 litres annually – losses that can be easily prevented with simple solutions.

“Water efficiency is no longer optional; it’s essential,” says Richard Braid, Managing Director of Cistermiser. “We are proud to support DEFRA’s bold goals by providing practical, scalable solutions that make a real difference. Our technologies empower businesses to intelligently take control of their water usage, reduce waste and contribute to a more sustainable future.”

Meeting these ambitious targets will require a collaborative approach, which is why Cistermiser is actively engaging with water utilities, facility managers and policymakers to create and implement best practices for water management.

Ongoing research and development initiatives aim to provide innovative tools that address both current and future water efficiency challenges.

Cistermiser is urging businesses, institutions and public sector organisations to prioritise water conservation as part of their sustainability strategies. Simple steps, such as retrofitting existing buildings with smart water management systems, can make a significant impact on reducing waste and achieving DEFRA’s targets.

Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.