Broag develops skid-mounted boiler packages

skid
Designed for quick and easy installation on side, Broag’s skid-mounted boiler packages are only 650 mm wide and mounted on wheels for ease of movement.
Broag now offers prefabricated skid-mounted boiler packages to reduce installation time on site. They are built on a rigid boxed steel frame with a width of only 650 mm and complete with lifting eyes and wheels so that they can be rolled through a standard doorway. These rigs come complete with pretested pipework and control packages.
For more information on this story, click here:Dec 2007, 278
Related links:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.