Zenex boosts boiler performance

Adding Zenex GasSavers to three condensing boilers in the multi-purpose Plymouth Pavilions has solved under-performance issues that resulted to inadequate supplies of hot water. and reduced overall gas consumption by at least 25%. The venue incorporates a leisure pool, ice rink, concert arena and conference facilities. The heating system was struggling to produce hot water and was very energy inefficient. More significantly, the existing heating and plumbing installation was consistently failing to deliver sufficient hot water to the swimming pool showers at peak periods and was very slow getting hot water pumped to the social areas of the complex, taking up to 40 minutes because of the distance from the boiler room and poor ring-main circulation.
For more information on this story, click here:Jan 08, 103
Related links:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.