The aftermath of Buncefield

Mitsubishi Heavy Industries
After Buncefield — air-conditioning for the new offices of FFEI to replace those destroyed by the explosion at Buncefield oil depot is provided by VRF equipment from MHI.

The new headquarters of digital-imaging specialist FFEI features an extensive VRF air-conditioning installation using equipment from Mitsubishi Heavy Industries installed by Macair fmi.

The 6100 m2 £2 million building at Hemel Hempstead replaces the company’s original design centre which, was reduced to rubble by the explosion at Buncefield oil depot in 2005. It houses administration, research and development and production.

Macair designed an air-conditioning system using a combination of VRF units and splits. There are 14 outdoor units linked to 53 indoor units. Macair’s site foreman Lee Pritchard was delighted with the way the system configured itself as it was switched on: ‘All systems self-addressed as soon as we put the power on. They were easy to install, they look great, and the client loves the new atmosphere we’ve created.’

David Lettis, general manager of MHI’s UK air-conditioning business, explains that the KX6 range has the advantages of VRF for about the price of a good splits installation and that significant savings in energy consumption are made possible by the re-engineered heat exchanger and new twin rotary compressor.

For more information on this story, click here: Feb 09, 138
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.