BG Controls exercises control at Catterick leisure centre

BG
The BMS for this 16 000 m2 leisure centre at Catterick Garrison was designed, installed and commissioned by BG Controls

BG Controls was responsible for the design, installation and commissioning of the sophisticated BMS for the new leisure centre at Catterick Garrison — the UK’s largest army base. Facilities in the £21 million centre, which is also open to the public, include a 25 m 6-lane competition pool, training pool, teaching pool and a 6-court sports hall for 5-a-side football, basketball, volleyball, netball and badminton. There are also cricket nets and trampolines.

Other facilities include a library and regional rehabilitation unit with specialist equipment to help military personnel recover from injuries or wound sustained in combat or while training.

The BMS in this 16 000 m2 building is based on Trend IQ3 controllers with customised control panels made in BG’s own workshop.

Networked via a Trend front end, the system controls the circulation of fresh air throughout the building. It also controls underfloor heating in the gym and conventional heating throughout the building. Advanced and easy-to-use graphics provide complete visibility over the site for monitoring and controlling every element of the system.

For more information on this story, click here: Nov09, 100
Related links:
Related articles:



modbs tv logo

Improved dry pocket for SpiroTrap and SpiroCombi

Spirotech has improved the dry pocket of the magnetic dirt separator in its steel SpiroTrap and SpiroCombi units, making them even easier to maintain.

FREE Heat Pump Training from BESA

The Building Engineering Services Association (BESA) is launching the industry’s only online training course for heat pump installation to help fill a skills gap highlighted by the government’s flagship Green Homes Grant voucher scheme.

Calendar