Imofa overcomes site challenges to install new air-handling plant

Imofa, contractor, AHU, air handling unit
Cramped conditions and highly restricted space were challenges faced by Imofa in the replacement of an air-handling unit in Colchester Town Hall.

When the refurbishment of Colchester Town Hall, dating from 1898, included improved disability access, the installation of a disabled lift came at the expense of the plant room and air-handling plant providing heating, ventilation and comfort cooling to the Jury Room, Mayor’s Parlour, members and committee rooms. However, Imofa UK rose to the challenge of removing existing plant and instal­ling a new unit on time.

Imofa’s sol­ution involved repositioning the fresh-air inlet in the external plant room and using the plant room itself as the inlet duct.

The original air-handling unit was taken apart by the Imofa site team, the panels cut up and, together with all component parts, removed through the high-level external plant room at the new location for the new fresh-air inlet. The replacement Imofa unit was delivered to site as a flat pack, along with a new axial-flow extract fan and silencer, centrifugal supply fan and heating and cooling coils. All components were transported to the plant room via the fire stairs and assembled in situ.

For more information on this story, click here: Feb10, 123
Related links:
Related articles:



modbs tv logo

BSRIA reports sustained global cooling demand as market diverges

BSRIA has released its latest analysis of the global cooling sector. The BSRIA Worldwide Air Conditioning and Heat Pump reports reveal a complex and diverging global cooling market.

CABE awards two new accolades alongside 2026 Honorary Fellowship

At the CABE presidential inauguration on 8th May, the Association was delighted to present two new awards for 2026 alongside its Honorary Fellowship for this year.