RIBA approves new CPD from Big Foot systems

Big Foot, CPD

The new CPD reflects the growing use of roof space for siting heavy plant on flat roofs, and highlights the importance of using support systems that minimise risks of leaks and cold bridging. The presentation also demonstrates the advantages of off-site fabrication to reduce installation time.

The new Big Foot CPD includes a look at the effects of damage to a flat-roof membrane, including leaks and cold bridging. It also shows examples of poorly supported equipment and the problems that they cause.

Big Foot only needs the weights and dimensions of roof plant to provide a high-quality support.

For more information on this story, click here: June 10, 210
Related links:
Related articles:



modbs tv logo

Network Infrastructure Assistant ECS card updated to include City & Guilds

A range of ECS cards are available through the Electrotechnical Certification Scheme (ECS) for the Network Infrastructure industry.

New guidance announced

The IOR has just released a new guidance note on the Pressure Equipment (Safety) Regulations and Pressure Equipment Directive (GN36) outlining the requirements for installers of RACHP systems. 

Calendar