Packaged boiler rooms are available on short delivery

Stokvis Energy Systems has standardised on Heatpak packaged boiler rooms with a standard specification for various heating loads to achieve rapid delivery to site — generally six to eight weeks. Heatpak units are relatively light, so they can often be installed on the roof of a building or alongside.

Equipment in Heatpak units can include high-efficiency boilers, condensing pre-mix boilers, plate heat exchangers, pressure and booster sets, and solar panels and vessels.

The combination of high-efficiency boiler and plate heat exchanger gives the benefit of a fully modulated heating and hot-water system — dramatically reducing running costs and giving a very short payback.

Stokvis Energy Systems, packaged boiler room

Units can be connected within a few hours of delivery, even in adverse weather conditions.

For more information on this story, click here: November 10, 172
Related links:
Related articles:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.