Packaged boiler rooms are available on short delivery

Stokvis Energy Systems has standardised on Heatpak packaged boiler rooms with a standard specification for various heating loads to achieve rapid delivery to site — generally six to eight weeks. Heatpak units are relatively light, so they can often be installed on the roof of a building or alongside.

Equipment in Heatpak units can include high-efficiency boilers, condensing pre-mix boilers, plate heat exchangers, pressure and booster sets, and solar panels and vessels.

The combination of high-efficiency boiler and plate heat exchanger gives the benefit of a fully modulated heating and hot-water system — dramatically reducing running costs and giving a very short payback.

Stokvis Energy Systems, packaged boiler room

Units can be connected within a few hours of delivery, even in adverse weather conditions.

For more information on this story, click here: November 10, 172
Related links:
Related articles:



modbs tv logo

BPMA and AEMT Sign Mutual Co-operation Agreement

The British Pump Manufacturers’ Association (BPMA) and the Association of Electrical and Mechanical Trades (AEMT) are pleased to announce the recent signing of a Mutual Co-operation Agreement. 

ECA calls for urgent energy price reform

The ECA has warmly welcomed the urgent reform of electricity pricing recommended by The Climate Change Committee today. The latest CCC report to Parliament recommends that future energy pricing must remove current fiscal disincentives to electrification, boosting the deployment and use of low carbon electrical energy across the UK.