Packaged boiler rooms are available on short delivery

Stokvis Energy Systems has standardised on Heatpak packaged boiler rooms with a standard specification for various heating loads to achieve rapid delivery to site — generally six to eight weeks. Heatpak units are relatively light, so they can often be installed on the roof of a building or alongside.

Equipment in Heatpak units can include high-efficiency boilers, condensing pre-mix boilers, plate heat exchangers, pressure and booster sets, and solar panels and vessels.

The combination of high-efficiency boiler and plate heat exchanger gives the benefit of a fully modulated heating and hot-water system — dramatically reducing running costs and giving a very short payback.

Stokvis Energy Systems, packaged boiler room

Units can be connected within a few hours of delivery, even in adverse weather conditions.

For more information on this story, click here: November 10, 172
Related links:
Related articles:



modbs tv logo

Construction Skills Certification Scheme (CSCS) Smart Check launched to boost competence and fight fraud

Construction Skills Certification Scheme (CSCS) has developed a ‘Smart Check’ app to help construction site operators verify the identities and qualifications of more than two million skills card holders. 

MBS attends the BESA launch of ‘safe havens’ blueprint for air quality

The Building Engineering Services Association (BESA) has completed its trilogy of free guides designed to help building owners and managers turn their buildings into ‘safe havens’ that protect occupants from health risks linked to airborne contaminants and viruses.