Packaged boiler rooms are available on short delivery

Stokvis Energy Systems has standardised on Heatpak packaged boiler rooms with a standard specification for various heating loads to achieve rapid delivery to site — generally six to eight weeks. Heatpak units are relatively light, so they can often be installed on the roof of a building or alongside.

Equipment in Heatpak units can include high-efficiency boilers, condensing pre-mix boilers, plate heat exchangers, pressure and booster sets, and solar panels and vessels.

Stokvis Energy Systems, packaged boiler room

The combination of high-efficiency boiler and plate heat exchanger gives the benefit of a fully modulated heating and hot-water system — dramatically reducing running costs and giving a very short payback.

Units can be connected within a few hours of delivery, even in adverse weather conditions.

For more information on this story, click here: November 10, 172
Related links:
Related articles:



modbs tv logo

Women In STEM: Breaking into A Man’s World

With the growth in the engineering sector in the last few years, the requirement of additional workers has led to an increasingly diverse workforce especially with the inclusion of women  

Legionella bacteria - Symptoms are similar to that of Covid-19

An outbreak of Legionnaires disease in the West Midlands has prompted Stuart Gizzi, Managing Director at plumbing equipment manufacturer Intatec to remind Facilities Managers that Legionella precautions can be automated 

Calendar