Durapipe ensures fuel delivery to hospital back-up generators

Durapipe, fuel supply
The vital task of delivering fuel to back-up generators at Whiston Hospital has been entrusted to Durapipe’s PLX pipework

Durapipe’s PLX pipework system has been installed to carry fuel from storage tanks to backup generators at the new Whiston Hospital on Merseyside. This secondary contained pipe-in-pipe system was used in sizes 100/160 mm, 90/160 mm and 63/110 mm to transport fuel and in a 90 mm single-wall version for the filling lines for the fuel storage tanks.

The PLX pipework was selected for its high performance properties. A visible polyamide line provides increased resistance to all types of fuel blends, and its robust polyethylene material provides exceptional resistance to rapid crack propagation and long-term stress cracking.

This £338 million PFI project contains over 800 beds, the latest diagnostic facilities in radiology and cardiology, a regional specialist burns and plastic-surgery unit and the full range of acute in-patient, emergency and out-patient services.

For more information on this story, click here:  Nov 2010, 130
Related links:
Related articles:



modbs tv logo

Grenfell is the building industry's Piper Alpha says CIBSE

The recent passage of the Building Safety Act is a welcome recognition of the fact that making safe buildings is a highly skilled operation says the Chartered Institution of Building Services Engineers, endorsing the need for more effective regulation and a profound change in culture.

Underlying project-starts uptick indicates gradual recovery, Glenigan data suggests

  • 13% rise in detailed planning approvals against the preceding three months
  • 18% decline in main contract awards against the previous year
  • 9% increase in underlying starts during the three months to May

Glenigan has released the June 2022 edition of its Construction Review.