Durapipe ensures fuel delivery to hospital back-up generators

Durapipe, fuel supply
The vital task of delivering fuel to back-up generators at Whiston Hospital has been entrusted to Durapipe’s PLX pipework

Durapipe’s PLX pipework system has been installed to carry fuel from storage tanks to backup generators at the new Whiston Hospital on Merseyside. This secondary contained pipe-in-pipe system was used in sizes 100/160 mm, 90/160 mm and 63/110 mm to transport fuel and in a 90 mm single-wall version for the filling lines for the fuel storage tanks.

The PLX pipework was selected for its high performance properties. A visible polyamide line provides increased resistance to all types of fuel blends, and its robust polyethylene material provides exceptional resistance to rapid crack propagation and long-term stress cracking.

This £338 million PFI project contains over 800 beds, the latest diagnostic facilities in radiology and cardiology, a regional specialist burns and plastic-surgery unit and the full range of acute in-patient, emergency and out-patient services.

For more information on this story, click here:  Nov 2010, 130
Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.