Pump replacement brings energy savings

Grundfos Pumps, quick fixes
Huge energy savings have been achieved in a German hospital following the replacement of the existing pumps.

Replacing pumps in a 238-bed hospital in Germany has reduced energy consumption by 40 MWh a year following a pump audit carried out by Grundfos Pumps. Salem Hospital in Heidelberg was built in the 1970s, and the audit discovered that the existing pumps were tremendously oversized, which is often the case in older buildings. They were also far less efficient than today’s high-efficiency speed-controlled pumps.

Grundfos explains that even pumps that are only five to 10 years old can be outdated, as modern speed-controlled pumps ensure that flow and pressure are always precisely adapted to actual demand, providing greater energy efficiency and significant savings — so even smaller upgrades can be worthwhile.

For more information on this story, click here: October 2012, 106
Related links:
Related articles:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).