Mikrofill helps seafront hotel give warm welcome

Mikrofill, boiler,space heating

Effective heating and hot-water services have been restored at the St George’s Hotel on the sea front of Llandudno following the installation of Mikrofill wall-mounted condensing boilers and its hot-water loading systems. They new equipment replaces dated horizontal calorifiers and inefficient cast-iron boilers — all of which had long been in need of replacing.

The hotel turned to Ener-G, a specialist in the energy-efficiency market, which worked with installer Heater Services of Rochdale to resolve the problem.

The new equipment comprised four Ethos 130 kW condensing boilers in free-standing frames and three Rapide Extreme 500 l hot-water loading systems. Each unit can deliver 2570 l/h of hot water while maximising the efficiency of the Ethos boilers. Temporary boiler plant enabled the hotel to stay open while the work was carried out.

For more information on this story, click here: January 2014, 92
Related links:
Related articles:



modbs tv logo

Rinnai UK launches applied products division

Rinnai is launching a new division - Rinnai Applied - which will be dedicated to the design, supply and service of larger HVAC units and systems that will meet the specific heating, ventilation, air conditioning and hot water demands of commercial and industrial premises.

Engineering services alliance welcomes government consultation on retentions and late payments

Actuate UK, the engineering services alliance, has welcomed the new government consultation on reforming cash retentions and taking legislative measures against late payments to small businesses, as part of the new Small Business Plan unveiled on 31st July 2025.