Mikrofill supplies new plant for luxury hotel

Mikrofill, space heating, boiler, DHW, Hotels, leisure

Upgrading the existing oil-fired LPHW and HWS circuits at a hotel operated by Amazing Venues group included the installation of four Mikrofill condensing boilers, two pressurisation packages and three Extreme HWS loading cylinders complete with unvented kits. The design for Stanbrook Abbey Hotel near Worcester was prepared by building-services consultants Energy Performance Solutions.

The equipment was installed in two plantrooms. To preserve the character of the building in which one plantroom was located, the existing brick chimney stacks were lined to accommodate the new boilers.

In the other plant room, each of the two Extreme cylinders can produce 845 l of hot water in 10 minutes at 60°C to achieve a combined flow of 2.8 l/s.

The boilers have a high turndown ratio — 40:1 on one plantroom and 20:1 in the other.

The new equipment was installed by mechanical contractor Daly Engineering Services.

For more information on this story, click here: April 2017, 104
Related links:
Related articles:



modbs tv logo

Construction Skills Certification Scheme (CSCS) Smart Check launched to boost competence and fight fraud

Construction Skills Certification Scheme (CSCS) has developed a ‘Smart Check’ app to help construction site operators verify the identities and qualifications of more than two million skills card holders. 

MBS attends the BESA launch of ‘safe havens’ blueprint for air quality

The Building Engineering Services Association (BESA) has completed its trilogy of free guides designed to help building owners and managers turn their buildings into ‘safe havens’ that protect occupants from health risks linked to airborne contaminants and viruses.