Energy meters are quick to install

BMS, BEMS, control, Energy meter, Carlo Gavazzi

Carlo Gavazzi’s EM270 energy meter can be installed five to 10 times more quickly than other energy meters and associated current transformers. A single meter can measure all electrical variables and energy of two independent 3-phase loads or six independent single-phase loads via its two RJ11 inputs.

Detachable dual-voltage terminal blocks allow up to 20 meters to be daisy chained. The RS485 port provides a daisy-chain solution to any serial bus.

Available as Modbus+2xpulse or Modbus+Modbus versions, these meters provide fast and easy data transmission to PCs and PLCs for full load control. All electrical parameters of the installation can be sent via an optional RS485 port for integration with a BMS or other standard acquisition-monitoring systems.

A choice of systems can be programmed for active and reactive energy measurement and a selection of 3-phase or single-phase loads. Options include system variables such as W, var, power factor, Hz and phase sequence. Single-phase variables include A, VLL, VLN and power factor. TRMS measurements cope with distorted sine waves and energy measurements (total KWh and reactive kVAh) for one or two 3-phase loads or up to six single-phase loads.

These meters are rated equivalent to Class 1 (kWh) according to EN 62053-21.

For more information on this story, click here: May 2014, 90
Related links:
Related articles:



modbs tv logo

Nuaire celebrates long service and a people-first culture built over decades

Nuaire has celebrated the exceptional loyalty and dedication of its employees at a long service awards event – a powerful reflection of a workplace culture that has been built and sustained over generations.

New advanced training facility opens to upskill HVAC industry

A new education facility has opened its doors and is set to advance skills and knowledge across the UK’s HVAC industry.