FDS delivers smoke ventilation for London residential development

Fire Design Solutions (FDS) is designing, supplying and installing smoke-ventilation system for the riverside Marine Wharf development in Deptford, London. The FDS team initially carried out an appraisal of the 3-core blocks before installing mechanical smoke ventilation and car-park ventilation systems.

The development comprises apartments with one, two and three bedrooms, lower-ground parking and a Tesco Express store.

FDS was engaged by mechanical engineer LKF.

For more information on this story, click here: May 2015, 135
Related links:
Related articles:



modbs tv logo

Schneider Electric and RIB back industry-leading Embodied Carbon Calculator technology

Schneider Electric and RIB have partnered with Building Transparency, a non-profit organisation that has developed the Embodied Carbon Calculator.

BEAMA releases tool to help heating installers explain the new requirement in the Building Regulations to their customers

New regulations for existing homes mean that, from June 15th, 2022, heating installers will be required to install thermostatic room controls when replacing a boiler.