Elco supplies HIUs for regeneration project

Space heating, Elco, HIU, heat interface unit

Elco UK has supplied 350 Nexus Futura Bitherm heat-interface units for the Stoke Quay residential development in Ipswich. The heating installation also includes three R3603 floor-standing condensing boilers and a Gemini indirect cylinder.

This major redevelopment project in the historic docklands area of Ipswich has created over 350 new homes. The mixed-tenure scheme included five blocks of apartments with one and two bedrooms, and 25 4-bedroom town houses.

The Elco products were specified by Brighton-based M&E consultant PJR services. The Nexus heat-interface units were specially designed for this project, with top-exit pipework to accommodate the design conditions. They provide up to 19 kW of heating and up to 70 kW to domestic hot water.

For more information on this story, click here: November 2015, 104
Related links:
Related articles:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.