Advertorial - Altecnic Heat Interface Unit records impressive results in BESA test

Engineer

The Altecnic SATK32107 Heat Interface Unit (HIU) records industry beating results during rigorous ‘UK Standard for Heat Interface Units’ test, coordinated by the Building Engineering Services Association (BESA).

It’s specifically designed to achieve maximum efficiency on low temperature / heat pump lead networks and recorded the lowest VWART (Volume Weighted Average Return Temperature) and annual primary flow rate on the low temperature tests out of the twenty-three HIU’s previously put through the standard – a mark of a highly efficient HIU.

Heat Pump Ready: Future-proofing heat networks

The SATK32107 achieved a VWART figure of just 28C on the low temperature tests. VWART is a measure of efficiency and details the return temperatures that would be achieved on a typical UK project when the HIU is in all its operating modes. The resultant figure shows how good the HIU is at using the available energy from the network. The lower the number, the more efficient the HIU is.

Neil Parry
Neil Parry

The SATK32107 also recorded a very low required annual primary flow rate of 90.71 cubic metres. This means that when in operation the SATK32107 on a low temperature network, requires less primary water than any other HIU so far tested. This reduces the amount of water circulating in the heat network reducing heat losses, energy use and carbon emissions. When looking at a typical project, the reduction in circulating water over a year can be staggering. A saving, the equivalent of 5 Olympic sized swimming pools can be achieved!

Neil Parry, Head of Specification, says: “We are delighted with the performance results of the SATK32107, confirmed by the BESA test. Efficient HIUs are crucially important on any heat network, but even more so, if it is a low temperature heat pump network. This is also highlighted within the latest revision of CIBSE CP1 (2020).  The performance of the SATK32107 allows you to future proof the heat network. If the building is currently utilising high temperature sources, such as CHP or boilers, then by installing the SATK32107 now, it becomes a much lower cost and simple exercise to convert the energy centre to heat pumps at some point in the future. The HIU’s will simply utilise the lower flow temperature and supply the demands required by the apartment without issue.” 

Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.