Elco delivers heat to Land Rover dealership
One of the first installations of Elco’s 53 kW Thision S plus boilers is at Yeovil Land Rover, Somerset. It has been installed with a low-loss header and supplies heating and hot water to the pre-delivery area next to the main showroom. The boiler has been installed on a new system as part of ongoing developments of the dealership’s buildings.
The configuration of the heat exchanger of these boilers ensures continuous automatic de-aeration. The down-firing pre-mix burner can modulate down to a sixth of full output.
The boiler was specified and installed by Tim Mills of M&E contractor United Mechanical.