Martindale supplies boiler service engineers with testing kits for electrical safety

Martindale Electric, electrical test kit, boiler, Worcester

Martindale Electric has supplied Worcester, Bosch Group with kits to enable its service engineers to prove that installation they are working on in the field are electrically isolated and avoid potentially hazard live voltages. The company has over 300 service engineers across the UK. The VIPD138 safe-isolation kits include a voltage indicate and proving unit.

Safe electrical work requires the use of a voltage indicator that has been proved with a proving unit before and after use; both are contained in the VIPD kit.

The VI-13800 voltage indictor has been designed to meet BS EN 61243-3:2010 for 2-pole low-voltage live-working voltage detectors.

For more information on this story, click here: July 2016, 87
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.