Olympic legacy building transforms to Here East

Grundfos Pumps

The former press and broadcast centre of the London 2012 Olympic Games, for which Grundfos was the sole pump supplier, is being configured into a tech and media hub. The original design has meant that the building can be easily adapted, which is proving to be invaluable as the building makes its transition into a tech and media hub.

Called Here East, it will come into full operation during 2017, and is expected to be the largest technology innovation centre in Europe. It will support 500 on-site organisations with state-of-the-art facilities.

The centre was designed to include ‘green’ office space with four storeys of workspace.

The original pump installation involves over 70 NBE energy-efficient pumps, all of which were supplied pre-bolted and pre-wired on inertia bases. 10 pressurisation sets were also supplied, as well as six Hydro MPC-E booster sets.

For more information on this story, click here: January 2017, 127
Related links:
Related articles:



modbs tv logo

Four new appointments at BCIA

THE Building Controls Industry Association (BCIA) has appointed a new Vice-President and three new additions to its Management Committee.

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations.