Roof hatches help meet Part L

Bilco

Bilco has improved its entire range of roof hatches to reduce air leakage and thermal insulation to help meet Part L of the Building Regulations. All Bilco hatches are now fitted with closed-cell EPDM sponge gaskets to give a better seal of the cover to the curb.

Independent tests have shown that the maximum leakage at pressures up to 600 kPa is less than 4.83 m3/h/m2 — giving the hatches a Class 1 rating under BS EN 12207:2000

50 mm of faced polyisocyanurate insulation board is fitted to the cover and the curb. Super TUFF-R has a component U-value of 0.47 W/m2/K and accepts a variety of roof adhesives.

For more information on this story, click here: Aug 09, 171
Related links:
Related articles:



modbs tv logo

EBSSA publishes Strategic Skills Plan

The Engineering and Building Services Skills Alliance (EBSSA) has published its strategic Sector Skills Plan, as part of the work undertaken by the Construction Mission Skills Board.

AI automation boosts efficiency at Polypipe Building Services’ manufacturing site

Polypipe Building Services has enhanced manufacturing efficiency, productivity and sustainability through a major programme of automation investment at its production facility in Aylesford.