WRAS approval for pressurisation units

Armstrong

Armstrong’s 3750 range of pressurisation units have received WRAS (Water Regulations Advisory Scheme) approval. This approval confirms that these units comply with UK water-authority regulations and that, once installed, there is no need for annual inspections.

These pressurisation units meet the requirements of a type AB air gap and the performance criteria specified in BS EN13077. The cistern design ensures protection against backflow by fluids containing contaminants, up to fluid category five.

For more information on this story, click here: Oct09, 170
Related links:
Related articles:



modbs tv logo

Lighting the way

Halesowen College has set a sustainability example for higher education institutions by installing smart lighting as part of its latest environmental initiative, making up to 85% energy savings compared to the previous system.

BESA updates HIU Test Standard

The Building Engineering Services Association (BESA) has announced an important update to its UK Heat Interface Unit (HIU) Test Standard, further strengthening performance benchmarks and supporting the sector’s readiness for incoming heat network regulation.