Chilled beams serve water company headquarters

Air conditioning in the new headquarters building of Three Valleys water at Hatfield is provided by Trox active chilled beams installed flush with the ceilings . This 8000 m2 structure is on the site of the legendary de Havilland aircraft factory and clad in clear-glazed curtain walling interspersed with smooth-faced precast concrete panels extending the full height of the building.

Not only do these active chilled beams achieve high levels of comfort with low air velocities and sound levels, but they also achieve low whole-life costs.

Maintenance requirements are limited to the coils being cleaned every three to four years. There are no moving parts, no filters and no drip trays and associated pipework.

To balance and control the primary airflow, iris dampers were fitted to these beams by Trox.

The building was designed by Kier Southern, with Kier Building Services responsible for all M&E design.

For more information on this story, click here: OCT09,135
Related links:
Related articles:



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.